The shipping table is updated above (we got the 110 VFDs we were waiting for).
Just a Spindle on order number 10612. This is a replacement for one that has problems. Can I get an idea when it will ship?
Thanks
Customer support requests are out-of-band from this shipping table.
I finished preparing your motor today and will go out today when UPS shows up.
For reference, my Order # 9937 (110V spindle) shipped yesterday and just arrived. But then I’m only 200 miles away. Looking forward to tearing up some wood.
Thank you Daniel for keeping us informed. Helps tamp down the anxiety. But it tells you how much excitement everyone has for what you offer.
Does the delay affect the 220v 2.2kw orders?
Yes it is both types. We can fulfill up to order 10277 this week, and then we will be out of VFDs until Delixi air ships about 100 or so (of both 110 and 220) to arrive early March, and then another 300 arriving shortly after that which can fulfill all outstanding orders. So we will be playing catch up all of March.
What timeframe can I expect for delivery on order 10811?
Need a pwn 1.5kw 110v 80mm air cooled configured for onefinity pro controller with iot power controller 3/28/2024.
When should I ordered?
Hello just checking to see estimated shipping dates for Order 10976.
Thanks
Hi folks! If you are wondering about your order, it should be possible for you to look at your order number and determine which of the most recently reported blocks you are in. Of course, not every order is for an ATC, so we might be in luck to get our order sooner than we think!
At this point, it appears there are two blocks of motors arriving by air freight in the next few weeks. They are run in by the team to make sure there are no defects that the manufacturer missed. At that point, your system will get boxed and shipped pretty quickly. You’ll get a shipping notification when that happens and you can follow the package to your doorstep!
It’s going to be great to install a fully dialed-in ATC that works out of the box for a long time. If the wait is getting you down, just imagine the wait if your home built ATC was failing over time. At this point, the wait is less or equal to the future losses of futzing around with a home built. And don’t forget, any late stage changes are more likely to be in our units, which is awesome.
Is there an estimate as to when spindle order #10972 might ship?
thanks
If your order isn’t on the shipping table, we have to estimate 6 weeks for now.
I have order #10774 which have several components. Can you tell me when this might ship? Thanks.
Just to let everyone know I’m order number 10383 and I have the 220v air spindle kit and I got a tracking number today. Woohoo!
We’re back in full shipping swing
Diana’s pulling additional internal resources to help keep the flow going.
U think 10976 willbe April?
Thanks
Probably will be right at the end of March, but I will certainly try to speed things up.
Only 460 to go for my order!!!
We don’t have that many outstanding spindle orders. Not every order is a spindle.
Thanks very much Diana. Looking forward to it.